AEC Collections

The advanced workflows made possible by the tools in the AEC Collection can produce inventive designs that address its clients’ complex engineering needs. The Collection has the latest softwares of Autodesk which includes Autocad, Revit, Civil 3D, Infraworks, Navisworks Manage, 3DS Max, Recap Pro, Advance Steel, Fabrication CadMEP, Insight, Revit Live, Structural Bridge Design and many more softwares to adopt with the advancing technology in Engineering and Architecture.


Bentley Staad

3D Structural Analysis and Design Software

This software can perform comprehensive analysis and design for any size or type of structure faster than ever before using the new STAAD.Pro CONNECT Edition. Simplify the BIM workflow by using a physical model in STAAD.Pro that is automatically converted into the analytical model for structural analysis. It can Share synchronized models with confidence for multi-discipline team collaboration and, most importantly, deliver safe, cost-effective designs.

COSTX®

A FULLY INTEGRATED 2D AND 3D ESTIMATING SOFTWARE

With BIM (Building Information Modelling) fast emerging in the construction industry and various estimating software packages claiming to support BIM, you need to make sure your software will cover all the BIM bases. CostX® is renowned worldwide as a leading BIM estimating solution and is used in a variety of industries for this reason.

Not only can you view and takeoff from 3D models / BIM (including IFC) within the program, you can support 5D BIM using information from the model live-linked to user-defined rate libraries and workbooks- all within the one program. A networked environment allows instantaneous information sharing with others working on the server. CostX® also imports a multitude of drawing files and external rate information, and exports to a variety of formats, taking interoperability to a new level. It’s never been easier to bring BIM into your business with CostX®.

Oracle Primavera P6 Professional Project Management

High-Performance Project Management

The recognized standard for high-performance project management Primavera P6 Professional Project Management, handles large-scale, highly sophisticated and multifaceted projects. Organize projects of up to 100,000 activities with unlimited resources and an unlimited number of target plans.

Oracle Primavera P6 is used by all military and federal agencies in the US. In fact, statistics have shown the overwhelming majority, 375 out of 400, of top engineering companies in the US use Primavera P6.

Oracle Primavera P6 popularity is rapidly growing for its ability to plan, manage, and control all facets of a project. Due to this popularity, many advocate sitting and practicing the use of the software.